
Option 2 of redesign changes. The design starts with the changes made in option 1B (floor and walls) and then removes the bidet and adds tall storage in its place.
Option 2 of redesign changes. The design starts with the changes made in option 1B (floor and walls) and then removes the bidet and adds tall storage in its place.